Evaluate three-phase centrifuge suppliers in China with ten checks for supplier identity, tested performance, documentation, supply scope and after-sales support.
Verify who is supplying the equipment
Establish the legal contracting entity, manufacturing location and responsibility for design, assembly and service. A trading company and a manufacturer can offer different scopes; document who will resolve technical questions and warranty claims. Request model-specific information and a feed assessment. Avoid assuming that a familiar company name proves ownership of a particular design or production capability.
Compare equivalent technical offers
Give suppliers the same feed range, phase quality targets and site conditions. Ask for representative trial evidence and a clear list of included components. Quoted maximum flow can be misleading if solids loading or outlet specifications differ. Confirm utilities, materials, controls and auxiliary equipment before comparing prices. Review the ten checks below with the proposed supplier and project engineer.
Confirm delivery and acceptance responsibilities
Define inspection records, factory testing, transport preparation, installation support and site commissioning in the supply scope. Clarify documentation language, parts identification and ongoing service arrangements. Agree measurable acceptance criteria and how deviations will be addressed. This guide supports supplier due diligence; it does not claim an independently verified ranking of Chinese companies or certify every product offered by a supplier.

SENZ three-phase decanter reference; confirm the actual model and included scope.
Evaluation checklist
| Check | Evidence to review |
|---|---|
| 1. Contracting identity | Legal name and responsible contacts |
| 2. Factory capability | Model-specific production and quality records |
| 3. Duty definition | Feed range and required phase qualities |
| 4. Trial basis | Test feed, methods and operating conditions |
| 5. Included equipment | Main machine, pumps, controls and auxiliaries |
| 6. Materials | Wetted parts, seals and cleaning compatibility |
| 7. Documentation | Drawings, manuals and parts lists |
| 8. Testing | Inspection and agreed factory acceptance scope |
| 9. Site support | Installation, commissioning and training responsibilities |
| 10. Service terms | Warranty scope, spare parts and repair arrangements |
Frequently asked questions
Does a China-based supplier always manufacture the machine?
Verify the actual design and manufacturing responsibilities for the proposed equipment.
Is the lowest machine price the lowest project cost?
Include installation, utilities, consumables, service and downtime assumptions.
Should certificates be accepted without checking scope?
Check that relevant documents apply to the supplier, model and project requirements.
Related guidance
- 3-Phase Centrifuge Manufacturers: 10 Evaluation Checks
- Complete Equipment Suppliers: 10 Procurement Checks
Contact SENZ with your feed data, equipment model and project targets to discuss a suitable evaluation.