tina@senz-separation.com    +86-82211558
Cont

Have any Questions?

+86-82211558

Dewatering Of Sludge in Water Treatment

Dewatering Of Sludge in Water Treatment

Shenzhou's sludge dewatering system is a highly efficient, truck-mounted dewatering solution. It is designed for use in septic tanks, waste transfer stations, oily wastewater, car wash runoff, sewage treatment plants, ditches, and ponds — anywhere on-site solid-liquid separation is required. The system can reduce sludge volume by up to 90%, producing a dewatered sludge cake with a solids content typically between 15% and 25%.
Send Inquiry

Product Introduction

Jinhua Shenzhou Centrifuge Co., Ltd. is one of the leading manufacturers and suppliers of dewatering of sludge in water treatment in China. Please feel free to wholesale customized dewatering of sludge in water treatment at competitive price from our factory. For more cheap products, contact us now.

 

Dewatering of Sludge in Water Treatment                                                                                                                                            

 

Equipment Details
Automatic Sludge Dewatering Screw Press

Components

Truck (carriage needs reconstruction), sludge centrifugal dehydrator, sludge pipe, dosing system, dosing pipe, sludge suction pump, generator set, on-site control box

Sludge Dewatering in Water Treatment

Connection

Sludge pipe connects sludge suction pump and sludge centrifugal dehydrator, uses high-pressure water hose, movable joint easy to disassemble, portable, length selectable

 
 
 
 
Processing Procedure
Automatic Sludge Dewatering Screw Press
01.

Steps:

Truck transports equipment to destination & parks near sludge thickener; place sludge suction pump at sludge tank bottom; start generator set; add sludge flocculant to dosing system; start sludge centrifugal dehydrator & suction pump; sludge flocculant (stirred by drug dissolving mixer) conveyed by dosing metering pump to centrifugal dehydrator

02.

Advantages:

Can handle various sludge types, solve sludge disposal problem in small stations, reduce secondary pollution risk

Automatic Sludge Dewatering Screw Press

System Characteristics                                                                                                                          

 

 

 

Integrated screw stacker system possible

 

Equipped with truck for anytime, anywhere dewatering

Movable operation

Electric control box for workflow control, more convenient operations

Continuous electrical operation, high efficiency, safe & environmentally friendly, reduces labor intensit

Generator set enables work without three-phase electricity

 

Material Selection

Depending on customer requirements, wetted parts can be manufactured from austenitic stainless steel (such as 321 or 316L), Hastelloy, titanium alloy, or other corrosion-resistant materials.

+

-

 

 

 

 

Technical Parameters                                                                                                                                                                                                                                                                

Selection Basis

 

Physical Properties of Separated Substance (Suspension)

Separation Requirements

Processing Capacity

Technological Requirements

Other Factors

Effects and Advantages:

 

Obtain Satisfactory Separation Results

Achieve Economic Benefits

Customization Options:

 

Customizable Colors

Customizable Materials

 

On site setup: from to operation

1. Site Assessment and Positioning
Before dispatch, our technical team reviews the job site layout to confirm truck access, parking space near the sludge source, and ground stability for the vehicle. On arrival, the truck is parked as close as possible to the sludge thickener, tank, or pond to minimize suction hose length.

 

2. Power Connection
If a three-phase electrical supply is available on-site, the system can connect directly. Where no external power source exists, the on-board generator set is started first and allowed to stabilize before any other equipment is powered on.

 

3. Suction Line Deployment
The sludge suction pump is lowered into the sludge tank, pond, or thickener. The suction hose is connected using the quick-disconnect movable joints, and hose length is adjusted on-site depending on the distance between the truck and the sludge source.

 

4. Flocculant Preparation
Dry or liquid flocculant is loaded into the dosing system's dissolving tank, where the chemical dissolving mixer prepares a homogeneous solution at the correct concentration before dosing begins.

 

5. System Start-Up
Once suction lines are connected and flocculant is prepared, the operator starts the centrifugal dehydrator and suction pump from the on-site control box. Dosing rate and pump flow rate are adjusted in the first few minutes of operation to match the specific sludge characteristics at that site.

 

6. Monitoring During Operation
Operators monitor cake dryness and effluent clarity throughout the run, fine-tuning flocculant dosage as sludge consistency varies. The control box provides real-time indicators for pump status, dosing rate, and any fault alarms.

 

7. Shutdown and Cleaning
At the end of the job, the suction line is flushed with clean water, the dehydrator bowl is rinsed to prevent residue buildup, and all hoses and joints are disconnected and stored for transport to the next site.

 

Contact now

 

Hot Tags: dewatering of sludge in water treatment, China dewatering of sludge in water treatment manufacturers, suppliers, factory, Sludge dewatering centrifugal decanter, digester wastewater treatment, Electroplating wastewater treatment, two phase separator, Centrifuge machine used in microbiology lab, Centrifuge for The Pharmaceutical Industry

Send Inquiry

(0/10)

clearall